Project Description
The project consists of the construction of a parking structure at City Block 177, bounded by 10th and 11th streets, Convention Plaza, and Lucas Avenue, in downtown St. Louis, Missouri 63101. The site is currently a surface parking lot that is in use.
The proposed development is a 10-story above grade parking structure, with one or two levels to include retail and or residential components. Preliminary design loads have been provided, typical column loads will be approximately 2500 kips, net uplift of approximately 500 kips, and seismic base shear is approximately 1800 kips.
RFP submittals are due no later than 3:00 PM on August 23, 2022 at the following location:
Treasurer’s Office, City of St. Louis
421 So. 10th Street (Cupples Garage)
St. Louis, MO 63102